标准规范下载简介和预览
2010年全国职称英语理工类(A)考试真题及答案详解(含中英文对照详细翻译)本试卷共分为四个部分:词汇选项、阅读判断、概括大意与完成句子以及阅读理解。内容涵盖科技、工程、环境等多个理工相关领域,语言规范、难度适中,贴近实际考试要求。答案解析不仅提供正确选项,还逐句翻译文章内容,分析考点和语法结构,有助于考生提高英语阅读能力和应试水平。
通过学习本真题及解析,考生可以熟悉考试题型、了解命题趋势、强化语言基础,是备考职称英语考试的重要参考资料。适合需要晋升职称的专业技术人员使用,也可作为英语学习者的辅助材料。
dbj51/t 091-2018 四川省公共建筑机电系统节能运行技术标准(附条文说明) D.It had a mass of one percent of the sun.
35.According to the last paragraph,all of the following are goals of the simulation project EXCEPT
A.to know more about the mass and properties of the first stars of the universe
B.to simulate the process of how the early universe began
C.to apply the simulation to the study of nuclear reaction initiation
D.to discover the truth about the formation of a protostar
The Iceman
On a September,day in 1991,two Germans were climbing the mountain between Austra and Ita. 1y.High up on a mountain pass,they found the body of a man lying on the ice.At that height (10,499 feet,or 3,200 meters),the ice is usually permanent,but 1991 had been an especially
Who was the man?How and when had he died?Everybody had a different answer to these questions.Some people thought that it was from this century,perhaps the body of a soldier who died in World War I,since several soldiers had already been found in this area.A Swiss woman who believed it might be her father,who had died in those mountains twenty years before and whose body had never been found.The scientists who rushed to look at the body thought it was probably much older,maybe even a thousand years old.
By studying his clothes and tools,scientists have already learned a great deal from the Iceman about the times he lived in.we may never know the full story of how he died,but he has given usimportant clues to the history of those distant times.
A.he was lying on the ice
B.two Germans were climbing mountains
C.the melted ice made him visible
D.he was just on a mountain pass
37.What can be inferred from paragraph 2?
A.The iceman was killed while working.
B.The iceman could have died from the wound in the head.
C.The iceman lived a poor life.
D.The iceman was struck dead from behind.
A.he was a soldier in World War I
B.he came from Italy
D.He was born about a thousand years ago
A.was hit in the shoulder by an arrowhead
B.was probably in some kind of a battle
C.had got a wound on the back of his head
D.has a tiny hole in his skin causing his death.
A.robbers
B.soldiers
C hunters
D.shooters
Scientists Make Sweet Discovering
Good news for chocoholics:the treat preferred by millions all over the world is good for you, according to American researchers at the University of California.Chocolate contains substancescalled flavonoids that can help maintain a healthy heart and good circulation.The researchers havediscovered that cocoa acts like aspirin and that eating a bar of chocolate has also been shown to release endorphins in the body:these chemicals help to reduce pain and stress and make you feel happy.
The Olmec Indians of Mexico and Central America were the first to grow cocoa beans,in about1500 BC,and the Mayas were drinking unsweetened coca hundreds of years before it became fashionable in Europe.
In 1544,a delegation of Mayan nobles visited Philip of Spain and gave him jars of cocoa as a gift.Cocoa soon became fashionable in Spain and Portugal.The Spanish were the first to add sugarto their cocoa drink.
41.Why is chocolate good for heaa and circulation?
A.It reduces pain and stress.
B.It containS substances called flavonoids.
C.It releases endorphins in human body.
D.It acts like aspirin to protect heart.
A.as a drink
B.as a gift
C.as food
D.as a medicine
43.What does James Bakers and John Hanan do about chocolate?
A.They produce the first mild chocolate.
cjj 224-2014 城镇给水预应力钢筒混凝土管管道工程技术规程 B.They introduce chocolate to Europe.
C.They add sugar to make chocolate bars.
D.They make chocolate accessible to average man.
44.Which is the following statement is not true according to the passage?
某公路路基土石方工程专项施工方案 A.Chocolate contains substances that make people feel happy.
B.Chocolate is good for health if it is eaten with added milk.
C.Eating chocolate occasionally contributes to a healthy diet.