地连墙欧洲规范( Diaphragm wall EN 1538 )

地连墙欧洲规范( Diaphragm wall EN 1538 )
标准编号:
文件类型:.zip
资源大小:1.84M
标准类别:交通标准
资源ID:226586
免费资源

标准规范下载简介和预览

地连墙欧洲规范( Diaphragm wall EN 1538 )

地连墙欧洲规范EN1538简介

EN1538是欧洲标准化组织(CEN)发布的关于“地连墙”(DiaphragmWall)施工的技术规范标准,全称为《执行地下连续墙施工的专用工作规范》(*Executionofspecialgeotechnicalworks–Diaphragmwalls*)。该标准为设计与施工单位提供了在欧洲范围内通用的地连墙施工技术要求和指导原则,适用于建筑、桥梁、隧道及地下工程中使用的地连墙结构。

EN1538标准涵盖了地连墙施工的全过程,包括墙体设计基本原则、槽段开挖、泥浆护壁、钢筋笼制作与吊装、混凝土浇筑、质量控制与检测等内容。标准强调了施工过程中对环境的影响控制、安全措施以及材料性能的要求,旨在确保地连墙在承载力、止水性和耐久性方面的可靠性。

总之db63∕663-2007 煤矸石砖及煤矸石多孔砖砌体结构设计与施工技术规程,EN1538是欧洲地连墙工程实施的重要依据,有助于提升施工质量与安全性,促进跨国工程的技术统一与互认。

Indryexcavations,aspermittedin8.4.1,concretingshallbecarriedout insuchawaytoavoidsegregation.Direct pumpingispermittedindryexcavations.Vibrationof theconcreteisnotpermittedwhentheslumpvalueexceeds 100mm(classS3,S4,orF3,F4,inENV206).

Inexcavationsusingsupportingfluids,concreteshallbeplacedbeneaththesupportingfluidthr concretingpipes.Concretingpipesareusuallytremiepipes,whicharepipesequippedwithahop mayalsobepipesconnecteddirectlytoconcretepumps.

susingsupportingfluids,concreteshall beplacedbeneaththesupportingfluidthroughoneor pes.Concretingpipesareusuallytremiepipes,which arepipesequippedwithahopperat thetop pipesconnecteddirectlytoconcretepumps

Page20 EN1538:2000

Theexecutionofanytypesofdiaphragmwallrequirescarefu Thefollowing itemsshallbesupervised and controlled during 司) preliminaryworkpriortotheexcavationphase: positionof thewall; materials; reinforcementcaqesandotherelementstobeinserted

Theexecutionofanytypesofdiaphragmwallrequirescarefulsupervisionandmonitoringofthe Thefollowing items shall be supervised and controlled during the various phases of construction a)preliminaryworkpriortotheexcavationphase: positionofthewall; materials; reinforcementcagesandotherelementstobeinserted;

Page21 EN 1538:2000

b)wallconstruction: excavationmethod,dimensionsandalignment; cleaningtheexcavation; formingthejoints; placingthereinforcementsorotherelements; concreting All itemsmaynotbeapplicabletoeachtypeofwall. Tables3to7list thecontrolstobeperformedforthevarioustypesofdiaphragmwalls. Control of theexecution shallbe in accordance with theproject specifications. Controls for special execution techniques, such as the use of polymers as a supporting fluid, are not considered in thisclause.

Page 22 EN1538:2000

Page23 EN 1538:2000

Table3(continued)

Table3(continued

Page24 EN1538:2000

Page 24 EN 1538: 2000

Table 3 (end)

Table 3 (end)

Page 25 EN1538: 2000

tobecontinued

Page26 EN 1538: 2000

Table4(end

Page 27 EN1538: 2000

able5 Controlsforreinforce

"tobecontinued

Page28 EN1538: 2000

Table5(end)

省道改扩建工程安全技术交底大全aVerticality and continuityofexcavation shallbe controlled in order toremain within therequired tolerances.Themonitoning frequency shalbe increased for cases presenting highrisksuchas where boulders or obstructions are present in the ground.These controls shallnormallybe by visual observation or simple measurements (e.g. position of grab cables).Special measures (e.g.inclinometers) to determine the excavated profile may be necessary in somecases,e.g.in deeppanels.

idcontinuityof excavationshallbe controlledinoraer toremainwwin inerequireu torerarices.Tmemormomyequencys ases presentinghighrisk,such as where boulders or obstructions are present in the ground.These controls shallnormally beby simple measurements (e.g. position of grab cables).Special measures (e.g.inclinometers) to determine the excavated profile m mecases,e.g.in deeppanels.

Page29 EN 1538:2000

Page30 EN 1538:2000

Table6(end)

calityandcontinuityofexcavationshallbecontrolledinordertoremainwithintherequiredtolerances.Themonitoringfrequencysh es presenting highrisk,such as whereboulders orobstructions are present in the ground.These controls shallnomallybebyvisua measurements (e.g. position of grab cables). Special measures (e.g. inclinometers) to determine the excavated profile may be ned e.g.indeeppanels.

Page31 EN1538:2000

Page32 EN1538: 2000

房屋装修的注意事项及施工工艺Table 7 (end)

©版权声明
相关文章