标准规范下载简介和预览
BS EN 13810-1-2002 木基板.夹层地板.性能规范和要求BSEN138101:2002是一项欧洲标准,全称为《木基板—夹层地板—第1部分:性能规范和要求》。该标准主要针对用于建筑结构中的夹层木地板(Timberbasedsandwichpanelsforflooring)提出了技术性能规范和相关要求,适用于住宅和非住宅建筑中作为楼板结构使用的木基夹层板。
标准规定了夹层地板在机械性能、承载能力、刚度、剪切强度、耐久性以及连接性能等方面的技术要求。它涵盖了产品的设计、制造、测试方法和评估标准,确保产品在实际应用中具备足够的结构安全性和功能性。此外,标准还对夹层板的材料组成、构造形式、接合方式以及环境适应性进行了规范。
BSEN138101:2002的制定为制造商、设计师和施工方提供了一个统一的技术依据,有助于提升木基夹层地板的产品质量和工程应用水平。它也支持了CE标志的认证过程,符合欧洲建筑产品法规(CPR)的要求,促进了产品在欧洲市场的流通与使用。
总之,该标准为木基夹层地板提供了全面的性能规范,确保其在现代木结构建筑中能够安全、高效地应用,具有重要的工程指导意义。
db13∕t 5193-2020 普通干线公路路网监测点布设与建设技术规范2002CEN All rightsof exploitation inanyformandby anymeansreservec worldwideforCENnationalMembers
All rightsof exploitationinanyformandby anymeansres worldwideforCENnationalMembers
AccordingtotheCEN/CENELECInternalRegulations,thenational standardsorganizationsof thefollowing coun tries are bound toimplement this European Standard:Austria,Belgium,Czech Republic,Denmark,Finland France,Germany,Greece,lceland,Ireland,Italy,Luxembourg,Malta,Netherlands,Norway,Portugal,Spain,Swe den,SwitzerlandandtheUnitedKingdom.
heCEN/CENELECInternalRegulations,thenationalstandardsorganizationsofthefollowingcou nd to implement this European Standard:Austria,Belgium,Czech Republic,Denmark,Finlal any,Greece,Iceland,Ireland,Italy,Luxembourg,Malta,Netherlands,Norway,Portugal,Spain,S ndandtheUnitedKingdom.
ThisEuropeanStandard incorporatesbydated orundatedreference,provisionsfromotherpublications.These normativereferences are cited at the appropriateplacesin the text,and thepublications are listed hereafter.For datedreferences,subsequentamendments toorrevisions ofanyofthesepublicationsapplytothisEuropean Standardonlywhenincorporatedinit byamendmentorrevision.Forundatedreferences,thelatesteditionof the publicationreferredtoapplies(includingamendments)
Particleboards
Solidwoodpane
Cementbondedparticleboards
Table1—Characteristicsofpanelproductstobeconsideredinspecifications
Table 2—EuropeanStandardsforspecifications and testmethodsrelevant to thedesignparameters of floatingfloordecking
4.1.2Durability
biological durability
moistureresistanceandgluebondqualitydependingonpaneltype
ropeanStandardsrelatingtothedurabilityof
4.1.3Mechanicalproperties
4.1.3.1General
thodsandrequirementsaresetoutinTables4.5
4.1.3.2 Loadcategories
Dynamic impact loads. 4.1.3.6 Alternatingload
WheelloadinrelationtoloadcategoryB,CorD
C1: Areas with tables,e.g. areas in schools,cafes,restaurants,dining halls,readingrooms,receptions C2: 1 Areaswith fixed seats e.g.areas in churches,theatres or cinemas conferencerooms,lecturehalls,assemblyhalls,waitingrooms C3: 1 Areaswithout obstaclesfor movingpeople,e.g.areas in museums exhibition rooms,and access areas in public and administration buildings,hotels C4: Areas with possible physical activities,e.g.dance halls,gymnastic rooms,stages C5: Areassusceptible toovercrowding,e.g.inbuildingforpublicevents like concert halls,sport halls including stands,terraces and access areas D1: 2 Areasingeneralretailshops D2: 2 Areas in department stores,e.g.areas in warehouses,stationary andofficestores
requirements of characteristicvalues giveninTable4 canbe satisfiedby using either thevalues set out in E testdataderivedbyusingEN789andEN1058.
4.2Supporting materia
See annex A
The floatingfloorshallbe sufficiently stiff to ensure that the specified use does not cause deflections thatmayinflu enceitsperformance.
Loads and deflectie
In addition tothose limits specified in6.4 of EN 12871:2001 therequirements set out inTables 5,6 and 7beloy shallbesatisfied.
entratedpointload—Loadanddeflectionreg
Table6—Alternatingload—Load,cyclesanddeflectionrequirement
hj 1134-2020 生活垃圾焚烧飞灰污染控制技术规范(试行)pad—Dropheight,numberofimpactanddefl
Documentation
A.1Examplesforfloatingfloors
ypicalconstructionsareshowninFiguresA.1,Al
AnnexA (informative)
Installation of floating floors
《城市公共汽电车客流调查方法 jt/t935-2014》FigureA.3—Exampleofafloatingflooronasuspendedfloorsyst
FigureA.3—Exampleofafloatingflooronasuspendedfloorsystem